Description

Shared Logistics Center in top location next to A7 motorway with connection to Hamburg/Hanover:

  • fully automatic high-bay storage with permanent simulation of daily volumes for optimum order control (LAS Logistic Assistant System)
  • Chilled and temperature controlled (+1°C up to +20°C)
  • fulfillment services - from delivery coordination to complete shipping management control
  • copacking/display construction, incl. compliance with T1 hygiene standard
  • stickering/packaging
  • innovative picking strategies (e. g. pick by voice)
  • route optimization in outbound transports
  • bonded warehouse type E
  • high security standards due to access and video control
  • certifications: DIN EN ISO 9001:2008, DIN EN ISO 14001:2009, prepared for TAPA C/HACC
Warehouse Specification
  • Area

    19500 m2

  • Pallet Capacity

    49500 pallets

  • No. of Loading Docks

    29

Location

Warehouse in Bad Fallingbostel, Germany

Lets get you started: